Demo website by Shoreline Sites Make it yours

Driftwood Dock & Bulkhead

Practical Answers for Barnegat Bay Docks

Local guidance on NJ permits, piling condition, dock types, costs, tides, and coastal weather.

February 19, 2026

NJ Dock Permits: A CAFRA and NJDEP Guide

Most new docks and major dock changes in coastal New Jersey need an NJDEP waterfront approval, a local construction permit, or both. This guide explains the usual review path before work begins.

Read more →

April 9, 2026

How Long Do Dock Pilings Last in NJ Waters?

Treated timber dock pilings in New Jersey often provide roughly a 20 to 40 year planning range, but marine borers, installation, and the waterline exposure zone can shorten that range. Inspection matters more than age alone.

Read more →

Start with a waterfront assessment

Tell us what you see at the dock, wall, lift, or pilings. We will arrange a site visit and explain the next step.

Request an Assessment

Get In Touch With Us